Switching to solar is a massive step. Our transparent, step-by-step roadmap ensures a seamless transition.
How We Build Your System
Consultation
We analyze your energy usage, conduct a site survey, and discuss your goals to propose the best solar solution tailored for you.
Engineering & Permitting
Our in-house engineers design your custom system. We then handle all local permitting and utility approvals on your behalf.
Installation
Our certified installation team securely mounts the hardware, installs the panels, and runs the electrical wiring, typically in 1-2 days.
Activation
After the final city inspection and utility connection approval (PTO), we flip the switch and you start generating clean energy.
Common Questions
Everything you need to know about timelines and installation preparations.
From the initial consultation to final activation, the typical timeline ranges from 4 to 8 weeks. Most of this time is spent waiting on city permits and utility approvals.
For most residential properties, our crew completes the physical installation within 1 to 2 days, ensuring minimal disruption to your daily routine.
We prefer that an adult be present at the start of the project and for interior electrical access, but it is not required for the entire exterior roof work.
During our initial site survey, we will inspect your roof's condition. If a replacement is needed, we offer integrated roofing and solar packages to save you money.